Extension of the construction site due to emergency measure
During the current construction work in Parcusstraße at the level of houses 4-6, it is necessary to extend the construction area due to an emergency measure that is absolutely essential for the water pipe. Motorized individual traffic will only be guided past the construction site in one lane via the remaining bus lane. There will be no changes for pedestrians and cyclists. Work is currently underway to repair the damage so that the second lane can be reopened as quickly as possible.